action needed
The package has not entered testing even though the delay is over
normal
The package has not entered testing even though the 5-day delay is over.
Check why.
testing migrations
-
excuses:
- Migration status for citeproc-py (0.9.2-1 to 0.9.3-1): Waiting for test results or another package, or too young (no action required now - check later)
- Issues preventing migration:
- ∙ ∙ Autopkgtest for citeproc-py/0.9.3-1: amd64: Pass, arm64: Pass, i386: Pass, ppc64el: Pass, riscv64: Pass, s390x: Test triggered
- ∙ ∙ Autopkgtest for duecredit/0.11.2-2: amd64: Pass, arm64: Pass, i386: Pass, ppc64el: Pass, riscv64: Pass, s390x: Test triggered
- Additional info (not blocking):
- ∙ ∙ Piuparts tested OK - https://piuparts.debian.org/sid/source/c/citeproc-py.html
- ∙ ∙ Reproduced on amd64 - info
- ∙ ∙ Reproduced on arm64 - info
- ∙ ∙ Reproduced on armhf - info
- ∙ ∙ Reproduced on i386 - info
- ∙ ∙ 8 days old (needed 5 days)
- Not considered