action needed
The package has not entered testing even though the delay is over
normal
The package has not entered testing even though the 5-day delay is over.
Check why.
testing migrations
-
excuses:
- Migrates after: r-cran-ggplot2, r-cran-transformr
- Migration status for r-cran-gganimate (- to 1.0.11-1): BLOCKED: Rejected/violates migration policy/introduces a regression
- Issues preventing migration:
- ∙ ∙ Autopkgtest for r-cran-gganimate/1.0.11-1: amd64: Pass, arm64: Pass, i386: Failed ♻, ppc64el: Pass, riscv64: Pass, s390x: Failed ♻
- ∙ ∙ Build-Depends(-Arch): r-cran-gganimate r-cran-ggplot2 (not considered)
- ∙ ∙ Build-Depends(-Arch): r-cran-gganimate r-cran-transformr (not considered)
- ∙ ∙ Depends: r-cran-gganimate r-cran-ggplot2 (not considered)
- ∙ ∙ Depends: r-cran-gganimate r-cran-transformr (not considered)
- Additional info (not blocking):
- ∙ ∙ Piuparts tested OK - https://piuparts.debian.org/sid/source/r/r-cran-gganimate.html
- ∙ ∙ Reproduced on amd64
- ∙ ∙ Reproduced on arm64
- ∙ ∙ Reproduced on armhf
- ∙ ∙ Reproduced on i386
- ∙ ∙ Reproduced on ppc64el
- ∙ ∙ 94 days old (needed 5 days)
- ∙ ∙ Remove hint for (transitive) dependency: r-cran-ggplot2, r-cran-isoband, r-cran-s2, r-cran-sf, r-cran-wk
- Not considered