Register
|
Log in
News for package
ruby-icalendar
[
2024-11-16
]
ruby-icalendar 2.10.3-1 MIGRATED to testing
(
Debian testing watch
)
[
2024-11-13
]
Accepted ruby-icalendar 2.10.3-1 (source) into unstable
(
Pirate Praveen
)
(signed by:
Praveen Arimbrathodiyil
)
[
2023-11-05
]
ruby-icalendar 2.10.0-1 MIGRATED to testing
(
Debian testing watch
)
[
2023-11-02
]
Accepted ruby-icalendar 2.10.0-1 (source) into unstable
(
Cédric Boutillier
)
[
2022-07-22
]
ruby-icalendar 2.8.0-1 MIGRATED to testing
(
Debian testing watch
)
[
2022-07-18
]
Accepted ruby-icalendar 2.8.0-1 (source) into unstable
(
Cédric Boutillier
)
[
2022-01-29
]
ruby-icalendar 2.7.1-1 MIGRATED to testing
(
Debian testing watch
)
[
2022-01-26
]
Accepted ruby-icalendar 2.7.1-1 (source) into unstable
(
Cédric Boutillier
)
[
2022-01-21
]
ruby-icalendar REMOVED from testing
(
Debian testing watch
)
[
2018-12-27
]
Accepted ruby-icalendar 2.4.1-2~bpo9+1 (source all) into stretch-backports, stretch-backports
(
Pirate Praveen
)
(signed by:
Praveen Arimbrathodiyil
)
[
2018-12-01
]
ruby-icalendar 2.4.1-2 MIGRATED to testing
(
Debian testing watch
)
[
2018-11-28
]
Accepted ruby-icalendar 2.4.1-2 (source) into unstable
(
Pirate Praveen
)
(signed by:
Praveen Arimbrathodiyil
)
[
2018-11-28
]
ruby-icalendar REMOVED from testing
(
Debian testing watch
)
[
2018-09-23
]
ruby-icalendar 2.4.1-1 MIGRATED to testing
(
Debian testing watch
)
[
2018-09-20
]
Accepted ruby-icalendar 2.4.1-1 (source all) into unstable, unstable
(
Pirate Praveen
)
(signed by:
Praveen Arimbrathodiyil
)