action needed
The package has not entered testing even though the delay is over
normal
The package has not entered testing even though the 5-day delay is over.
Check why.
testing migrations
-
excuses:
- Migration status for trapperkeeper-scheduler-clojure (- to 1.4.1-1): BLOCKED: Rejected/violates migration policy/introduces a regression
- Issues preventing migration:
- ∙ ∙ Updating trapperkeeper-scheduler-clojure would introduce bugs in testing: #1143432
- ∙ ∙ Autopkgtest for trapperkeeper-scheduler-clojure/1.4.1-1: amd64: Failed ♻, arm64: Pass, armhf: No tests, superficial or marked flaky ♻, i386: No tests, superficial or marked flaky ♻, ppc64el: No tests, superficial or marked flaky ♻, riscv64: No tests, superficial or marked flaky ♻, s390x: No tests, superficial or marked flaky ♻
- Additional info (not blocking):
- ∙ ∙ Piuparts tested OK - https://piuparts.debian.org/sid/source/t/trapperkeeper-scheduler-clojure.html
- ∙ ∙ Reproduced on amd64 - info
- ∙ ∙ Reproduced on arm64 - info
- ∙ ∙ Reproduced on armhf - info
- ∙ ∙ Reproduced on i386 - info
- ∙ ∙ 27 days old (needed 5 days)
- Not considered
-
all:
2
-
RC:
1
-
I&N:
0
-
M&W:
1
-
F&P:
0
-
patch:
0