action needed
The package has not entered testing even though the delay is over
normal
The package has not entered testing even though the 5-day delay is over.
Check why.
testing migrations
-
excuses:
- Migration status for r-cran-vdiffr (1.0.9-2 to 1.0.9-3): Waiting for test results or another package, or too young (no action required now - check later)
- Issues preventing migration:
- ∙ ∙ Autopkgtest for r-cran-bayesplot/1.15.0-1: amd64: Pass, arm64: Pass, armhf: Failed (not a regression) ♻ (reference ♻), i386: Failed (not a regression) ♻ (reference ♻), ppc64el: Pass, s390x: Test triggered
- ∙ ∙ Autopkgtest for r-cran-vdiffr/1.0.9-3: amd64: Pass, arm64: Pass, armhf: Failed (not a regression) ♻ (reference ♻), i386: Failed (not a regression) ♻ (reference ♻), ppc64el: Pass, s390x: Failed (not a regression) ♻ (reference ♻)
- Additional info (not blocking):
- ∙ ∙ Piuparts tested OK - https://piuparts.debian.org/sid/source/r/r-cran-vdiffr.html
- ∙ ∙ Reproduced on amd64 - info
- ∙ ∙ Reproduced on arm64 - info
- ∙ ∙ Reproduced on armhf - info
- ∙ ∙ Reproduced on i386 - info
- ∙ ∙ 6 days old (needed 5 days)
- Not considered